Costruzione Riser e Subsea spool per il Rigassificatore di Ravenna
Prefabrication
CustomerSAIPEM
LocationRavenna
Date20/09/2024
ScopeCostruzione di Riser, Spool ed Installation Aids
Project information
The scope of work icludes the construction of 1 riser and 3 subsea spools necessary for the underwater gas line from the marine terminal (FSRU) to land.
The pipe diameter is 26", and the average spool length is approximately 38 m.
Among the completion activities we can find: pressure testing at 131 bar; anode installation; epoxy paint coating; and PFP - Passive fire Proofing application.
Other minor elements included in the project are installation aids, such as; pull-in winch sheave; pull-in winch retaining beam; etc.